Project Director Data Centres, Madrid

Job Details
Type d'emploi

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Secteur d'activité

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Région

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Linum Consult’s client is an international design and build main contractor, specialising in the construction of large commercial and industrial facilities for international blue-chip clients. They are currently seeking a Project Director from a turnkey construction background to oversee their Data Centre division across Europe, based in Madrid.

RESPONSIBILITIES

  • Ensuring the performance, design development, and client satisfaction from pre-construction through to project completion
  • Collaborating closely with multidisciplinary international teams, managing the technical and commercial elements, and playing a pivotal role in maintaining and growing client relationships
  • Directing and coordinating design activities, including optimising technical solutions, controlling project milestones, and supporting technical excellence
  • Acting as the main point of contact for clients, leading change management, and ensuring client satisfaction throughout the project life cycle
  • Leading cross-functional international design and project teams, ensuring effective collaboration between all stakeholders
  • Partnering with local project teams during the execution phases, maintaining alignment between design intent and construction delivery

PROFILE

  • Master’s degree qualification in Civil Engineering, Urbanism, Mechanical or Electrical Engineering, or a similar field
  • At least 20 years’ experience within the turnkey construction industry, with at least 5 years of working on highly technical large data centre projects
  • Strong background of overseeing EPC activities
  • Exposure to M&E project management would be advantageous
  • Strong leadership and communication skills
  • Fluent in spoken and written Spanish and English
  • A history of working for either main contractors or engineering consultancies, with an established network of contacts within Spain to help develop the business
  • The right to live and work in the EU and travel frequently within Europe

APPLICATION PROCESS

If you fulfil the minimum requirements stipulated by our client and are confidentially interested in applying, then please drop Linum Consult a line with a copy of your CV and contact details to europe@linumconsult.com for the attention of Neill Donald.

Apply for this role
fr_FR